Hello, please:
- I have a curve SOP with few points
- then I edit the @P within the "Geometry Spreadsheet"
- the new @P are not transferred into the Coordinates and the Curve SOP gets "Soft Lock"
I have tried to find a help about the Soft Lock and it seems to be obsolete
- can I transfer the edited @P or other attributes to the SOP node?
- is there some other user friendly way to edit for example Curve SOP Coordinates? The line input with commas is not user friendly.
T