art3mis 55 Posted November 20 (edited) Hi Have switched to primarily using the TOPs ROP Geometry Output TOP for caching my simulations. Was wondering if it is possibly to pause or cacnel a caching operation half way thru (Dirty Selected Node) and then continue later by re cooking the node (With changed starting frame in Frame range). I have 'All Frames in One batch' selected under ROP Fetch tab. When I attempt this however I am always stuck on the first frame-workitem when re-cooking the ROP geo Output node. Edited November 20 by art3mis Share this post Link to post Share on other sites