Jump to content

TOPs ROP Geometry Ouput- pause and continue caching operation


art3mis

Recommended Posts

Hi

Have switched to primarily using the TOPs ROP Geometry Output TOP for caching my simulations.

Was wondering if it is possibly to pause or cacnel a caching operation half way thru (Dirty Selected Node) and then continue later by re cooking the node (With changed starting frame in Frame range).

I have 'All Frames in One batch' selected under ROP Fetch tab.

When I attempt this however I am always stuck on the first frame-workitem when re-cooking the ROP geo Output node.

Edited by art3mis
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...